°®¶¹´«Ã½

ESR Lot 2 Troups Road Logistics Estate

Overview

Vaughan Constructions completed the ESR Australia & NZ Lot 2 project at ESR's Troups Road Logistics Estate at Truganina, Victoria. 

Outcome

On a 42,000m² site, Vaughan delivered a 24,838m² industrial facility that includes 24,145m² of warehouse space, six loading docks, 11 ongrade docks, as well as 640m² of office area.

Internal heavy-duty floor slabs have an 8-tonne racking post load with capacity of 35,000 single-select pallet positions.

Externally to be completed is 10,190m² of heavy-duty paving, 2,380m² of light-duty paving, 100m² of cantilever awning and 4,475m² of super awning.

The project is designed to achieve a 5 Star Green Star Design and As Built v1.3 rating.

Facility Space

24,838M2

Location

Location